Page |
Situation |
Errata |
| viii | Missing in table of contents | Air temperature ... Page 32 |
| xxv | SW missing | Soil water content [mm] |
| xxii | Conflict of units in 'List of principal symbols and acronyms' - Eq. (2) |
note that ET, CR are in mm day-1 I, P, RO, DP, SF, SW are in mm. Note that ET is expressed in mm when used in equations with these terms, but it is expressed in mm/day when used in many other equations. The reader should distinguish the proper time unit. |
| 20 | line 6 from bottom | should read "resistance to vapour" |
| 39 | Example 5, second line from bottom | The Eq. 17 is missing a '2' in denominator |
| 45 | Table 3, last column | Change 0.035 to 0.0353 (more precision for conversion) |
| 54 | Eq. (41) | - sign (difference of temperature) instead of + sign |
| 75 | Box Example 19, line 3 | eliminate the word "average" |
| 99 | last line | delete the space between "d" and "escribing" |
| 110 | footnote 1 of Table 12 | add: "If not listed, use the Kc ini value for the crop category" |
| 121 | Illustration of the climatic effect -- last sentence | As an example, expected variations
for Kc mid for |
| 149 | (below Table 20) rules to determine fw |
replace the first bullet with the following two bullets:
|
| 154 -155 | Example 35 | Calculation for E and Kc on day 3 were incorrect and this influenced calculations for subsequent days. Also, rounding of De,i between days (to mimic hand calculations) in the original example has been changed to exact calculations using a spreadsheet. A new Example 35 is contained as an errata. |
| 167 | Figure 42 -- caption of X-as (at the bottom) is missing | Dr: root zone depletion |
| 172 - 173 | Example 38 | The recalculation for E and Kc in the errata for Example 35 has required change for Example 38 as well. A new Example 38 is contained as an errata. |
|
186 187 |
Eq. (97) Eq. (98) |
idem |
| 188 | Box 18 - last part | Where j : latitude [rad] (negative for southern latitudes) (Eq. 22) |
|
213 214 |
Table 2.1 First column Z idem |
|
| 224 | Eq. (3-8) | change 0.611 to 0.6108 to be compatible with eqn. 11 (R.Allen, 2/2001) |
| 226 | Eq. (3-14) | -0.0018 P ® -0.0021 P (this may require an explanatory footnote) |
| 226 |
List of parameters of Eq. (3-14) Kt turbidity coefficient [], 0 < Kt £1.0 where Kt = 1.0 for clean air and Kt = 1.0 for extremely trubid, dusty or polluted air |
Kt = 1.0 ® Kt » 0.5 |
| 227 |
First line of Equation (3-20) KD = 0.35 0.33 KB for KB £ 0.15 |
KD = 0.35 - 0.36 KB for KB £ 0.15 (i.e., 0.33 ® 0.36) (this may require an explanatory footnote) |
| 267 |
In section on Equations for figures 29 and 30 of Chapter 6. All occurrences where "Equation 3" is mentioned
|
All occurrences of "Equation 3" should be changed to "Equation 7-3" |
| 268 | Example 7-1 of Annex 7: Application of Eq. 7-3 to Example 25 | Calculation from equation is incorrect. Change four occurrences of "0.57" to "0.53" . Change two occurrences of "0.63" to "0.61" and change final answer from "3.2 mm/day" to "3.0 mm/day". |